A12 re-opening update after large crater forced closure

2
Skip to next photo
1/1
Show caption
1/1
This article is brought to you by our exclusive subscriber partnership with our sister title USA Today, and has been written by our American colleagues. It does not necessarily reflect the view of The Herald.

National Highways have provided an update on the re-opening of the A12.

The southbound carriageway remains closed between Ingatestone and Margaretting in Essex since 9am this morning after a large crater appeared on the road.

The crater was found to have been caused by water damage, with National Highways believing the source to be wastewater.

The closure has been in place since 9am (Image: National Highways)

A National Highways spokesperson said: "The A12 remains closed southbound in Essex following significant water damage to the carriageway, with the source believed to be wastewater.

"A Ground Penetrating Radar (GPR) survey is required to establish the extent of damage beneath the road surface and determine the scale of repairs needed.

"There are concerns that the water ingress may have compromised the supporting ground beneath the carriageway.

"Significant repair work is anticipated, with the priority being to fully assess the damage and ensure the road is structurally safe before reopening.

"Motorists should be prepared for a prolonged closure, with no confirmed timescale for reopening at this stage."

A diversion is in place for southbound drivers.

Motorists should exit the A12 at Junction 15 (Webb’s Farm) and follow the B1002 towards Margaretting and Ingatestone.

After travelling for just over three miles, turn left at signs for Ingatestone Garden Centre.

Continue for just under a mile to rejoin the A12 at Junction 13 (Ingatestone).

Drivers are advised to allow extra time for their journeys, with delays expected.

The AA are reporting delays of around 13 minutes on the B1002.

Get involved
with the news

Send your news & photos